Dark Transit
- Автор: DiMercurio Michael
- Серия: Anthony Pacino #1
- Год: 2021
- Язык: английский
- Год: Crossroad Press
- ISBN: 9781637899199
- Жанр: Триллеры
Электронная книга - «Dark Transit». Краткое содержание книги:
After Vermont misses the mark on an easy mission, there are questions asked about her ability to conduct the next mission, one that is vital to the security of the United States and the future of the submarine force. Vermont is tasked with stealing a revolutionary submarine that the Russians are testing with an Iranian crew because it's too risky to use Russian sailors. It's a high-stakes gamble for all involved, with the losers vanishing if things go wrong, the winners validating a world-changing technology.
Pacino is part of the mission to steal the submarine, but the toughest obstacle is a wolf-pack of Russians coming to the defense of the Iranian submarine. Getting it back to the United States for evaluation becomes secondary to surviving an exchange of missiles and torpedoes in an underwater battle that threatens to let the final genie out of the bottle.
2. (S) USS VERMONT INTERCEPTED OUTBOUND FREIGHTER “SARGASSO CAUSEWAY” CARRYING TARGETED NARCO-SUB 1000Z12MAY22. FREIGHTER OPENED HULL DOORS AND LOWERED TARGET SUBMARINE INTO CARIBBEAN SEA.
3. (S) USS VERMONT ESTABLISHED COVERT AND UNDETECTED TRAIL OF TARGET SUBMARINE. TARGET SUBMARINE STEAMED NORTH SUBMERGED WITH A RAISED SNORKEL MAST AND PERISCOPE. TARGET SUBMARINE WAS SNORKELING ON HER DIESELS AND PRESUMED TO BE CHARGING BATTERIES BEFORE SHIFTING TO SILENT RUNNING ON BATTERIES.
4. (S) SITUATION BECAME COMPLICATED WHEN FREIGHTER RECONFIGURED HULL DOORS AND COMMENCED STEAMING TOWARD TARGET SUBMARINE AND USS VERMONT. INTENT UNKNOWN BUT BELIEVED THAT FREIGHTER WAS GOING TO ESCORT TARGET SUBMARINE PART WAY OR ALL THE WAY TO TARGET SUBMARINE’S DESTINATION. THIS WOULD CAUSE MISSION FAILURE BECAUSE WHEN TARGET SUBMARINE SURFACED, IT WAS EXPECTED THAT FREIGHTER WOULD RENDER AID AND INTERRUPT MISSION.
5. (TS) USS VERMONT LAUNCHED MOD EMP KAKIVAK AT FREIGHTER. EMP DETONATION SHUT FREIGHTER DOWN. SHE LIES DEAD-IN-THE-WATER OFF SANTA MARTA.
6. (S) USS VERMONT TRAILED TARGET SUBMARINE, MATCHED SPEED, DEPLOYED SEAL TEAM TASK GROUP 80. SEALS INCAPACITATED TARGET SUBMARINE WITH NET OVER TARGET SUBMARINE’S SCREW. TARGET SUBMARINE SURFACED. SEAL FORCE AWAITED PERSONNEL COMING TOPSIDE TO TROUBLESHOOT PROBLEM. A HALF HOUR LATER, NO ONE HAD COME OUT OF THE HULL.
7. (TS) SEAL TASK GROUP 80 COMMANDER ENTERED HULL AND DISCOVERED THE TARGET SUBMARINE WAS AN ENTIRELY COMPUTER-CONTROLLED VESSEL. THERE WERE NO ACCOMMODATIONS FOR PERSONNEL. THE ARTIFICIAL INTELLIGENCE ABOARD TARGET SUBMARINE EXAMINED SEAL COMMANDER’S FACE AND PRESUMABLY CONCLUDED IT DID NOT MATCH ANY FACES IN ITS DATABASE. TARGET SUBMARINE IMMEDIATELY IGNITED SCUTTLING CHARGES. SEAL TASK GROUP 80 PROMPTLY WITHDREW AND WERE SUCCESSFULLY RECOVERED ABOARD USS VERMONT.
8. (S) TARGET SUBMARINE SANK IN CARIBBEAN SEA OVER 1,000 FATHOMS DEEP, EXACT POSITION TO BE RELAYED IN OFFICAL PATROL REPORT.
9. (S) MISSION CONSIDERED CONCLUDED. USS VERMONT EN ROUTE WINDWARD PASSAGE AND REQUESTS FURTHER ORDERS.
10. (U) CDR. T. SEAGRAVES SENDS.
//BT//